GENESIS FINTEC PVT. LTD. incorporated at Kolkata in 1996 is a professionally managed Organization, providing consulting services for Business & Infra Projects, both in the Private as well as Government Sector Our core team consists of experienced Chartered Engineers, Chartered Accountants, MBAs, Economists and Environmentalists.
|
Our Mission
|
• Dairy |
STRATEGY, PROJECT & FINANCE |
||
Abhay Mishra (FCA) |
Rajesh Chaturvedi (FCA) |
Sumit Agarwal (FCA, CS) |
Subrata Bhattacharya (ICWA inter) |
Prithi Jhingran (M.Sc Social Science) |
|
INFRASTRUCTURE DEVELOPMENT |
||
Avinash Singh (BSc.Engr; MIE)
|
Sabyasachi Mazumdar |
Santosh Mandal (MSc. Geology & Disaster Mgnt)
|
Ajoy Pan (B.Com),
|
DEVELOPMENTAL STUDIES |
VIABILITY STUDY |
STRATEGIC PLANNING |
WATER SUPPLY MANAGEMENT |
Strategy & Finance Abhay Mishra (FCA), Director Rajesh Chaturvedi (FCA), Director Sumit Agarwal (FCA, CS), Senior Consultant Subrata Bhattacharya (ICWA inter), Vice President Prithi Jhingran (M.Sc Social Science), Vice President |
Infrastructure Development Avinash Singh (BSc.Engr; MIE) , Director Santosh Mandal (MSc. Geology & Disaster Mgnt), Project Director Sabyasachi Mazumdar (M.E. in Public Health), Chief Consultant Technical Ajoy Pan (B.Com), Manager Administration |
Project | Scope of Work |
Dairy Project for New Kenya Co-operative Creameries Limited at Nairobi, Kenya
|
• Feasibility Study for setting up of Milk Drier at Nairobi
|
Dairy Projects for ITC Limited in India – Bihar, Saharanpur & Kolkata
|
• Identification of Milk Procurement Catchment & Routes • Feasibility Study for setting up of Dairy Plants • Preparation of Detailed Project Report |
Dairy Project for Graviss Foods P Ltd at Ahmednagar, Maharashtra
|
• Identification of Milk Procurement Catchment & Routes • Feasibility Study & Techno-Economic • Feasibility Report for setting up of a Dairy Plant |
Milk availability estimations in hinterland of 45 towns across India for ITC Ltd
|
• Assessment of Total Milch Bovine population, and • Assessment of Milk Production in catchments |
Dairy Project for PCM Group in North Bengal
|
• Feasibility Study for setting up of Dairy Plant
|
Dairy Project for Jhunjhunwala Group in Haryana
|
• Identification of Milk Procurement Catchment & Routes • Feasibility Study for setting up of Dairy Plant • Market Assessment of Dairy Products |
Study on Dairy Denelopment in North East India for NEDFI
|
• Pre - Investment Feasibility Study encompassing all 8 states.
|
Project | Scope of Work |
Luxury Car Rental Business of Gujral Distributors
|
• Strategy Consulting & Brand Building
• Organizational, Management & Systems development
|
Retail & wholesale business of Milage Footwear
|
• Strategy Consulting & Brand Building
• Organizational management & systems development
|
Fitness Equipment business of Bodyline Sports
|
• Business Plan for Retail Expansion
• Brand positioning & Marketing Strategy
|
Amusement Park at Kolkata
|
• Strategy Consulting
• Promotion & Marketing
|
Project | Scope of Work |
'The Garden Inn', at Bhubaneshwar, Orissa
|
• Preparation of Techno-Economic Feasibility Report for setting up a 3 Star Restaurant • Syndication of Term Loan & Working Capital • Corporate Advisory Services • Formulation, Introduction & implementation of MIS |
Setting up of Budget Hotel at Kolkata
|
• Concept Formulation • Preparation of Techno-Economic Feasibility Report • Corporate Advisory Services |
High end Resturant at Fatehpur highway, Rajasthan
|
• Feasibility Study for setting up of restaurant • Brand Positioning • Preparation of Project Report • Assistance in concept & implementation |
The Lindsay Himalayan Heights
|
• Scouting for, short-listing & identification of a suitable hotel for takeover on lease • Assessing the financial Viability for take over of the identified "Hotel Himalayan Heights" • Negotiating Terms & finalizing agreements for takeover • Assistance in putting in place systems , HR, required Interiors etc |
Rooftop Bar & Restaurant "Blue & Beyond" at Kolkata
|
Business transformation of the Restro Bar
• Feasibility Study
• Brand Positioning
• Assistance in concept & implementation
|
Hotel Lindsay at Kolkata
|
Business transformation of a 3 Star Hotel
• Diagnostic Study on guests perception • Re-positioning & Re-Branding of Hotel • Strategic Corporate Plan • Processes build-up & Organizational growth |
Hotel near Vagator Beach, Goa
|
• Setting up of a Hotel
• Market Feasibility Study
• Conceptual Model • Project Report |
Guest Perception Survey of Hotel Lindsay, Kolkata
|
• Capture the customer perception about the Hotel from guests
• Follow up Action Plan for customer delight
|
Serviced Apartments at Kolkata for M/s Gujral
Corporte Services
|
• Business Plan
• Strategy Consulting
|
Project | Scope of Work |
Health Infrastructure and Systems Assessment for 4 North East States under NHRM
|
• Assessment of procedures, processes , physical assessment of Infrastructure created • Assessment of local health Infrastructure needs & specific facilities needed • Preparation of State specific proposal |
Mission of Mercy Hospital at Kolkata
|
• Patient Satisfaction Survey for a multi-specialty hospital
• Capture the perception about the hospital from OPD & IPD patients & patient parties • Follow-up Action Plan for improving Patient experience |
IV fluids unit of SENBO Industries Ltd.
|
• Advisors to Public Issue
• Syndication of Term Loan and Working Capital
• Formulation of Financial Restructuring Plann
|
Manufacturing of Empty Capsules
|
• Appraisal of Techno-Economic Viability Study for State Bank of India
|
Project | Scope of Work |
MRTS at Nairobi,
Kenya
|
• Preparation of financial models and viability assessment
|
MRTS at Chennai
|
• Preparation of financial models and viability assessment
|
Independent Engineer service for 2-lane with
paved shoulder of Bhopal-Sanchi section of NH-86 (Extn.) from Km. 0.000 to 53.775 in the state of M.P. on BOT (Annuity) as DBFO Pattern
basis under NHDPPhase- III – Financial expert
|
• Preparation of financial models and viability assessment
|
Rajasthan Urban Sector Development Investment
Programme (RUSDIP) - Financial & Economic analysis of various sub-projects Like Water Supply, ROB; Roads,
Drainage etc. for a number of towns under the Programme.
|
• Evaluation of Financial & Economic returns of the sub projects, Municipal Finance Projections along with
FIRR & EIRR calculations
|
Bid Evaluation of
• Vivekananda Road Fly over
• Pedestrian Plaza Project connecting Sealdah with B.B.D.Bagh
• Modernization of Calcutta Tramways - Demonstration Project between Joka & Esplanade at Kolkata
on BOT basis for Transport Department, Govt of West Bengal at Kolkata
|
• Evaluation of Pre-Qualification documents submitted by Developers
|
Gariahat & Park Street Flyovers constructed by
Senbo Engineering Ltd.
|
• Planning and Preparation of Financial Proposal
• Syndication of Credit Facilities for Principal Contractor
|
Project | Scope of Work |
Preparation of "Detailed Project Report for setting up sewerage facility including Sewage Treatment Plants in
• 13 towns of Sikkim and surrounding areas
• Extension of Sewerage System below 5th & 6th mile NH – 31A, a part of Zone (200 Hectares). • Zone IV, Gangtok • Sikkim Main Trunk Road • Jalpaiguri Municipal Area under Karala action Plan for approx. 10 Km. length • Buxar, Kahalgaon, & Rajgir Nagar Panchayat of Nalanda district in Bihar • Integrated & Comprehensive pollution abatment scheme for Baranagar & Chinsurah Municipal Town In KMDA area under NGBRA. |
• Survey and Investigation of existing Systems and Identify major service gaps
• Assessment of present and future dry weather flow, Existing and future water generation,
• Estimation of STP capacities Layout drawing showing present status, proposed catchments,proposed sewer lines with sites for STP(s) • Estimation of project cost based on all the project components with O&M cost Estimation of project cost, preparation of implementation schedule and investment plan |
Preparation of "Detailed Project Report" for
Sewerage, Non Sewerage Schemes including preparation of Feasibility Report & City Sanitation Plan in the towns of Uttarakhand state
• Chamoli-Gopeshwar
• Badrinath
• Karnaprayag
• Govindghat
• Pandukeshwar
• Pipalkoti • Joshimath |
• Preparation of City Sanitation Plan
• Preparation of Feasibility Report & Detailed Project Report of Sewerage System
• Preparation of Detailed Project Report of Solid Waste Management
• Preparation of Bid Document & Non Sewerage Works including River Front Works
Prepare Feasibility Studies, Initial designs, detailed designs, construction drawings, cost estimates & a detailed implementation schedule. |
8mld Sewage Treatment Plant at Adampool,
Gangtok, Sikkim
|
• Consultancy services for finalization of Technology
• Preparation of Notice Inviting Tender (NIT)
• Construction Supervision
|
Projec | Scope of Work |
Consultancy services for preparation of Pre Feasibility Report Detailed Project Report for Drainage
Scheme for
• Dehri on Sone & Gaya Town
|
• Survey and Investigation of existing Systems and Identify major service gaps in
Drainage System • Preparation of DPR for developing new infrastructure and / or strengthening of existing infrastructure i.e Drainage System |
Project | Scope of Work |
Preparation of Pre- Feasibility Report and Detailed Project Report for Water Supply Scheme for
• Gaya (Dhobi), Sasaram & Aurangabad Districts of Bihar
• Fatuha, Islampur, Biharsharif, Rajgir, Gaya towns
• Darbhanga, Jamalpur , Katihar & Munger, Biharr
• Chaibasa, Hazaribagh, Jamshedpur, Pakur & Sahibganj Town, Jharkhand
• Begusarai Town, Jamui Town & LakhisaraiTown in Bihar
• Bally Jagach Block , District – Howrah, West Bengal (23.6 MLD WTP)
|
• Topographical survey along the main routes of the proposed delivery water mains
• Assessment of WTP capacities with design of delivery mains and intermediate pumping stations • Estimation of project cost based on different project components • Preparation of BOQ |
Preparation of Detailed Engineering Consultancy Works for Water Supply Scheme of
• Jamalpur & Munger Town Bihar
• Bally Jagach Block , District – Howrah, West Bengal (23.6 MLD WTP)
|
• Preparation of BoQ • Preparation of Working Drawing for Water distribution system, clear water rising main with cross section & long section |
Preparation of Detailed Design Drawing for Civil Work and 112 Kms. of Piping work
including soil investigation & topographical survey of Darbhanga Water Supply Scheme
|
• Soil investigation, design of high yielding tube wells including pump house,
Pump Chamber & Pump Rooms • Topographical survey design and drawing of pipeline network of 112 Kms • Design of stand post, chlorination tank, approved road, approach road, overhead tanks, boundary wall. |
Consultancy services for drawal of water for proposed expansion of Plant at Kulgachia
|
• Type of Intake facility, location of Intake point, Alignment of Rising Main,
L & X Section at or near the Intake Point, Fluctuation of water level of the river – LFL & HFL. Type of water utilization & treatment requirement • Detailed Engineering of the Drawal System of water, Intake facility, detailed working drawing, Pumping Machinery detail Economic diameter & L-Section of the Rising Main, Thrust block design, electrical & mechanical equipment within Raw Water Pump House & Valve details |
Project | Scope of Work |
Existing & New Industrial Growth Centers in North Bengal for West Bengal Industrial
Infrastructure Development Corporation
|
• Diagnostic study of existing Industrial Growth Centres in North Bengal
• Turnaround strategy for the Growth Centres
• Concept for the proposed New Centres
|
NEDFi sponsored Action Plan for Development after opening up of Moreh – Imphal and Zorkhatwar
(Champai) – Aizwal via Lunglei Highways
|
• Identification of:
- Potential Economic Activities
- Potential Infrastructure
- Border Trade
• SWOT Analysis
• Action Plan
|
Economic Survey Report 2007 – 2008 & 2008 – 09 for Finance Department, Govt. of Jharkhand
|
• Collection of Secondary data • Analysis & Compilation of Report |
Resource Mapping of Bihar & Strategic Action Plan for Development for Industries Department, Govt.
of Bihar
|
• Mapping the area-wise existing resources & their utilization
• Conceptualizing Vision, formulating Strategy & preparing Action Plan
|
Preparation of Perspective Plan under MGNREGS for
a. Jorhat & Golaghat districts, ASSAM
b. South, North & West districts TRIPURA
|
• Profiling the district
• Study of Socio-Economic condition and resources mapping of entire district
• Identification of shelf of projects & estimation of employment generation
|
Study on Socio-Economic Implications of GI Registrations for Commodities covering East
and North-East regions of India for UNCTAD
|
• Identification of products from each region suitable for GI registration
• Assessment of socio-economic Impact of GI Registration on stakeholders
|
Evaluation Study on Impact Assessment of ongoing Textile related schemes / programmes
being implemented in North East
|
• Assessment of the Schemes from Unit perspective and Socio-Economic situation
• Assessment of Linkages and Regulatory framework
• Preparation of Road Map
|
Projects under - Samanvit Gram Vanikaran Samridhi Yojana (SGVSY) in Nagaland - National Afforestation Programme (NAP) in Arunachal Pradesh, Manipur, Mizoram, Assam & Nagaland - Grant-in-Aid to Voluntary Agencies being implemented through NGOs at Singbhum in Jharkhand |
• Concurrent evaluation of Forest Development Projects
|
Project | Scope of Work |
Environmental Screening for proposed up-gradation of 1698 kms of roads in Punjab
|
• Study of Existing Environmental Settings
|
Rapid Environmental Impact Assessment (EIA) studies and Environmental Management Plan for 'Modern Industrial Park' at Barjora
|
• Study & Monitoring of Existing Environmental Setting
• Identification & Assessment of Positive and Negative Environmental
Impacts
• Preparation of Environmental Management Action Plan and Institutional Arrangements
|
Environment Impact Assessment (EIA) Studies, Social Impact and R&R Studies
for the proposed up-grading of Carriageway Configuration from Ranchi to
Rargaon
|
• Study & Monitoring of Existing Environmental Setting
• Identification & Assessment of Positive and Negative Environmental Impacts
• Study of Socio- Economic and Cultural Conditions
• Assessing the impacts in Consultation with Affected Groups and Government
Officials
• Preparation of Environmental Management Action Plan And Institutional
Arrangements
|
Rapid Environmental Impact Assessment (EIA), Social Impact and R&R Studies for
5 Roadways in the State of Sikkim
|
• Study & Monitoring of Existing Environmental Setting
• Identification & Assessment of Positive and Negative Environmental Impacts
• Preparation of Environmental Management Action Plan
|
Environmental Impact Assessment Study (EIA) for 7 road segments
(487 Kms) in the state of
• Jharkand
• Assam – sections of NH-37 & NH-36
|
• Study & Monitoring of Existing Environmental Setting
• Identification & Assessment of Positive and Negative Environmental
Impacts
• Preparation of Environmental Management Action Plan
|
Environmental Impact Assessment (EIA) for Construction of Inland Water Transport Terminal High Level Permanent RCC Jetty at Khidirpore, Kolkata
|
• Preparation of EIA/EMP report for RCC Jetty at Garden Reach for IWAI |
Geo – hydrological study in part of South- Calcutta and South- 24 Parganas of Metro
Rail Extension, between Tollygunge – Garia
|
• Physiography, Land Use Pattern, Geology and Geomorphology, Geohydrology Study of Socio- Economic and Cultural Conditions and assessing the impacts • Identification of Positive and Negative Impacts of the Rail extension proposed • Consultation with Affected Groups and Government Officials • Resettlement and Rehabilitation issues |
Project | Scope of Work |
Civil Work being under taken in schools of 4 districts of Bihar under the Sarva Shiksha Abhiyan
|
• Technical Supervision, Monitoring and Quality Assurance
|
Real Estate Development project at Burdwan
|
• Commercial Viability Assessment report
|
Real Estate Project at Siliguri
|
• Feasibility Study Assessment
• Concept Formulation
|
Integrated Steel Plant & Captive Power Plant for M/s BRG Iron & Steel
Co. Pvt. Ltd
|
• Technical assessment of Integrated Steel Plant & Captive Power Plant Project
|
Coal Based Thermal Power Project based on AFBC at Khuntuni, Cuttack
|
• Preparation of Techno-Economic Feasibility Report
|
12 MW Thermal Power Project based on AFBC & WHRB at Panagarh, West Bengal
|
• Preparation of Techno-Economic Feasibility Report
|
Setting up of Sales Outlets at Siliguri Market Yard for NERAMAC
|
• Techno-Economic Feasibility Report
• Analysis of Supply Chain,
• Competition Analysis
• Business Model
|
Tea Processing Machine Manufacturing Plant at Howrah
|
• Techno–Economic Feasibility Report for expansion program.
• Preparation for Finance Proposal and Syndication of Loan
|
Mixed Fertilizer Plant for M/s Bengal Manures Co. Pvt. Ltd.
|
• Technical appraisal of Project on behalf of State Bank of India.
|
Integrated Flexographic Self Adhesive Printing Labels project at Kolkata
|
• Preparation of a Bankable Project Report
|
Spindle Textile Yarn Unit for M/s Anantapur Textiles Ltd. at Howrah
|
• Preparation of Rehabilitation Package for submission to IDBI
under BIFR Norms
• Preparation of Financial Restructuring Proposal
|
Multilayer packaging film Unit
|
• Preparation of Bankable Proposal & Syndication of Loan
|
Merchant Navy Training Academy
|
• Strategy Consulting
• Corporate & Business Planning
|
Setting up of Uninterrupted Power Supply (UPS) manufacturing Unit.
|
• Project Formulation & Project Preparation
• Advisory Services on JV Collaboration
|
Ministry of Urban Development, GoI
• Preparation of DPR for 12 cities under scheme “Hriday” • Preparation of DPR for SMART Cities State Bank of India Public Health Engineering Department, Govt. of Bihar. Urban Development Department, Govt. of Jharkhand. Water Security & Public Health Engineering Department Govt. of Sikkim. Siliguri Jalpaiguri Developent Authority. Urban Development & Poverty Alleviation Department Govt. of Mizoram. ITC |
Registered Office :
|
© Copyright (C)GENESIS FINTEC PVT. LTD. 2015. All Rights Reserved.
Maintenance by : Softech ERP Solutions Pvt Ltd.